Iondrive (ASX:ION) appointed Wave International as a contractor to lead the front-end engineering design study for a pilot plant for its sustainable battery recycling technology, according to a Thursday Australian bourse filing.
At the end of FEED study, subject to a financial investment decision, the engineering, procurement, and construction phase of the plant will begin.
The commissioning of the pilot plant is on track during the year, which will be designed as a mobile unit, initially located at the University of Adelaide.
Recent pre-pilot plant optimization trials demonstrated 100% recovery of both lithium and aluminum from untreated black mass, per the filing.
It is evaluating mixed hydroxide precipitate (MHP), which typically contains around 40% nickel and 1% to 10% cobalt, as a potential feedstock for its Deep Eutectic Solvent process. It recently received MHP from a US-based producer.
Its shares fell 15% on market close on Thursday.
免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。