China Shenhua Energy (HKG:1088, SHA:601088) put into commercial operation the third set of units of the Phase II gas-fired heat and power co-generation generator project, dubbed as the Huizhou Phase II, according to a Wednesday disclosure on the Hong Kong Stock Exchange.
The Chinese energy project's subsidiary, China Energy (Huizhou) Thermal Power, manages the project, which is located in the Petrochemical Area of Daya Bay Economic and Technological Development Zone, Huizhou City, Guangdong Province, China.
The project has two sets of 400-megawatt-class pumped-condensate gas-steam combined cycle co-generation units.
The units passed the consecutive 168-hour full-load trial operation before starting operations. The fourth set of units will begin the trial operation soon.
The company's shares on the Shanghai bourse dropped almost 4% and those on the Hong Kong bourse slipped nearly 3% in recent trade.
Price (HKD): $32.55, Change: $-1.2, Percent Change: -3.56%
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。