Gullewa Says Unit Reports Results From Drilling at Western Australia Projects

MT Newswires Live
01-17

Gullewa (ASX:GUL) said Central Iron Ore released results for a 2024 first-phase reverse circulation drilling campaign at the South Darlot gold project and a 2024 first-phase diamond drilling campaign at the British King project, both in Western Australia, according to a Friday Australian bourse filing.

Assay results for the 31-hole 1,998-meter drilling program at the South Darlot project reported significant intercepts, including 1 meter at a grade of 9.5 grams per tonne (g/t) of gold from a depth of 67 meters.

Assay results for the six-hole 334.2-meter drilling program at British King also reported significant intercepts, including 3 meters at a grade of 22.7 g/t of gold from 57 meters.

Gullewa holds a 51% stake in Central Iron Ore.

It said further diamond and reverse circulation drilling for metallurgical, structural, and petrographic test work will be conducted.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10