QMines Ltd (ASX:QML)‘s maiden drilling program at the Develin Creek copper project has ended on a strong note, with the company picking up an intercept of 114 metres at 1.65% copper close to the surface.
The Queensland project – where QMines is looking for several volcanic-associated massive sulphide (VMS) copper-zinc deposits in the Rookwood Volcanics – had already been defined through a maiden mineral resource estimate (MRE) in 2023.
The estimates were set at 3.2 million tonnes (Mt) at 1.05% copper (Cu), 1.22% zinc (Zn), 0.17g/t gold (Au), and 5.9g/t silver (Ag).
Of this early info, 53% was categorised as inferred and 47% as indicated.
The drilling at Develin Creek was then completed in December 2024 and included 43 drill holes for 5,064 metres.
In one hole – mentioned above – this picked up 114 metres at 1.64% Cu, 0.86% Zn, 0.3g/t Au and 13g/t Ag from 11 metres, including 23 metres at 4.04% Cu, 1.12% Zn, 0.61g/t Au and 26.1g/t Ag from 55m, and 13 metres at 3.15% Cu, 1.37% Zn, 0.52g/t Au and 20g/t Ag from 94 metres.
This was one of two holes drilled down dip designed to assess the ore body’s continuity, dip and consistency for future open pit mining operations.
QMines shares have been trading at 5.5 cents.
Join the discussion: See what HotCopper users are saying about QMines Ltd and be part of the conversations that move the markets.
The material provided in this article is for information only and should not be treated as investment advice. Viewers are encouraged to conduct their own research and consult with a certified financial advisor before making any investment decisions. For full disclaimer information, please click here.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。