Renascor Resources (ASX:RNU) said it received early contractor involvement submissions from its engineering, procurement, and construction contractors for its proposed upstream graphite mining and processing operation in South Australia, according to a Friday filing with the Australian bourse.
It is reviewing the submissions to select a preferred contractor, the filing said.
The process includes incorporating design improvements to the comminution, flotation, and re-grind circuits.
The capital cost estimate of the mineral processing plant rose by 4.7%, or 2.8% of the overall pre-production estimate for the stage one upstream operation of AU$214.5 million compared with its 2023 battery anode material definitive study, per the filing.
The cost increases are primarily due to design improvements, inflation, and foreign exchange assumptions.
Its shares rose 4% on market close on Friday.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。