Hyterra (ASX:HYT) said drilling for natural hydrogen and helium is on track to start in mid-April, with its Sue Duroche 3 and Blythe 13-20 wells in drilling sequence at its Nemaha project in Kansas, according to a Tuesday Australian bourse filing.
Contractor Murfin Drilling is finalizing testing of the rig before mobilizing to the Sue Duroche 3 well pad.
It seeks to obtain key subsurface data for hydrogen and helium, including mud gas samples, wireline logs, and an in-depth understanding of reservoir characteristics.
The firm's geophysical program is also on track, with the aerial survey recently completed and the seismic acquisition survey to begin in April.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。