Elementos Reports Definitive Feasibility Study for Spain tin Project, Shares Rise Over 3%

MT Newswires Live
04-04

Elementos (ASX:ELT) reported the definitive feasibility study for the Oropesa tin project in Spain, based on a 1.4 million tonne per annum open-cut mining project with a base-case life of mine of 12 years, according to a Friday Australian bourse filing.

Under the study, the project is expected to produce an average of 3,405 tonnes of contained tin per year, as a tin ingot, for the European tin market.

The project has an average life of mine all-in-sustaining-cost of $15,000 per tonne of tin metal.

It also reported a maiden ore reserve estimate of 15.9 million tonnes at 0.36% grade of tin.

Its shares rose 3% on market close on Friday.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10