Wildcat Resources (ASX:WC8) said it continued to advance its Tabba Tabba lithium project in Western Australia, and definitive feasibility study test work is underway, including the scaled-up whole of ore flotation test work, ore sorting, and vendor test work, according to a Thursday Australian bourse filing.
Phase two preliminary feasibility study whole of ore flotation test work at the project delivered results consistent with phase one metallurgical testing, with spodumene concentrate at 5.60% grade of lithium oxide produced from 1.01% grade of lithium oxide composite ore feed, with an overall recovery of 84.5%.
It appointed engineering firm NewPro to complete a pre-feasibility study process plant engineering at the project, per the filing.
It is progressing with drill planning at its Bolt Cutter project in Western Australia to test a lithium anomaly. The firm also said that permitting was in progress for diamond drilling at the Mt. Adrah gold project in New South Wales.
Its shares jumped 7% in early trading on Thursday.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。