Mineral Resources (ASX:MIN) shipped 5.2 million wet metric tonnes (wmt) of attributable iron ores in the fiscal second quarter from its Onslow Iron, Pilbara, and Yilgarn hubs, up from 4.5 wmt in the first quarter, according to a Thursday filing with the Australian bourse.
The average quarterly realized price across all three hubs was $84 per dry metric tonne (dmt), up 3% from $82 the previous quarter, the filing said.
Total spodumene production for the three sites was 136,000 dmt, with 143,000 dmt shipped at an average price of $827 per dmt on an SC6 category in the quarter, the filing added. Output in the first quarter was 157,000 dmt.
The company's mining services division produced 68 million tonnes of ore, in line with the September 2024 quarter, as per the filing.