Zimplats Holdings (ASX:ZIM) reported mined volumes of 1.9 million tonnes in the December 2024 quarter, an 8% decrease from 2 million tonnes in the previous quarter, hampered by poor trackless mobile machinery availability and interruptions to power supply at the operations, according to a Thursday filing with the Australian Securities Exchange.
The 6E head grade for the quarter was 3.4 grams per tonne grade of gold, in line with the September quarter, the filing said.
Ores milled fell 8% quarter on quarter to 1.8 million tonnes from about 2 million tonnes due to lower ore supply and constrained operating capacity at the concentrator plants, the filing added.
The total operating cash costs increased by 3% to $139.6 million from roughly $135 million, influenced by higher power costs and timing differences in major engineering component replacements, according to the filing.
免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。